HP0-D06


제일 빠를 IT정보,제일 빠른 업데이트,확실하게 고객님의 걱정을 덜어드리는 killtest입니다.많이 찾아주시고 애용해 주십시요.

시험번호: HP0-D06

시험이름: Implementing HP Converged Infrastructure Solutions
Q&A: 72 Q&As
업그레이트: Jan-15-2010
시험문제:
1.

2. A customer has a Central Management Server (CMS) running Insight Manager 7. What must be done
to proceed with the installation of HP Insight Dynamics - VSE?
A. Upgrade to Rapid Deployment Pack 3.7 or later.
B. Install Virtual Connect Enterprise Manager (VCEM).
C. Upgrade the server to HP Systems Insight Manager 5.3 or later.
D. Nothing more needs to be done. The installation can proceed without modification.
Answer: C
3. What must you do to prepare the ports before stacking Virtual Connect Ethernet Modules?
A. You must define the root port.
B. You must designate a port as a stacking port.
C. You must define upstream and downstream neighbors.
D. You do not need to do anything because configuration is automatic.
Answer: D
4. Which statement is true about full virtualization?
A. It can be implemented completely only by using virtualization software.
B. It can be implemented only by using virtualization software with HP Integrity VT processor
assistance.C.It can be implemented completely either with virtualization software or with processor
virtualization assistance (AMD-V, Intel VT-x).
D. It is implemented in most operating systems at a basic level and special features require virtualization
software assistance.
Answer: C
5. Which key components are used to build a Virtual Connect infrastructure? (Select three.)
A. Virtual Connect Supervisor
B. Virtual Connect Ethernet modules
C. Virtual Connect Pass Thru modules
D. Virtual Connect Manager
E. Virtual Connect Switch Manager
F. Virtual Connect Fibre Channel modules
Answer: BDF
우리회사 홈페이지:www.killtest.kr
  1. No comments yet.
(will not be published)
  1. No trackbacks yet.